Baiji thermal power station 6 × 220 MW rehabilitation (ITT) com. Worked, as main subcontractor to ANSALDO energia of Italy.
The main activities of the group within this contract was the following
The camp construction for the workers
Mobilization of heavy equipment
Hot and cold survey of the units
Blades of turbine rotors replacement
Replacement of boiler tubes
Many other subcontracts within the power plant
The total contract price for the first two units (5&6) was 43 million USD
while the contract price for the whole plant was 137 million USD our share
was 12.2 million USD.
The rehabilitation of Daura and Dibis gas turbine power plant
Shamara group (ITT)
was the main subcontractor to FIAT- AVIO of Italy for
the rehabilitation of Daura gas turbine power plant 4× 37 MW and Dibis gas
turbine power plant of 5× 37 MW type TG 20.
The rehabilitation includes the following activities of the group to gather
with FIAT-AVIO
Camp construction
Survey of all the units
Blades replacement
Hot path repair
Bearing maintenance
Main filters over haul
Over haul of control system
Vibration elimination of bearings
Balancing of all the units
The total contract price including the spear parts was 40 million USD our
share was 6.2 million USD.
Contract in Jordan singed Between ITT and Ministry of Electricity
Jordan. Electrification of 250 villages through the construction of 132/33/11 kv
transmission lines. The contract price 4 million USD.
The contract was completed successfully.
Yuissifiah power station 8×210 MW Shamara group (H.O.C) works as the main subcontractor to T.P.E. Of Russia
for the construction of Yuissifiah power station on turnkey bases. The main
contract price is 960 million USD divided into two phases. The work started
with phase 1 for three units with a total contract price of 419 million USD.
H.O.C main activities in the project are the following
Camp construction
Required personal
Earth filling
Piling works
Concrete channels
Turbine house main building
Heavy equipments supply
Aux. Civil contracts.
Supply, install and commission of water treatment plant of 200m3 / hour
to Basrah refinery total amount 1.5 million USD
The Rehabilitation. Of Al-Haswa Power plant in Yemen. 4 unites of 840 MW
each.
AFTER LIBERATION
H.O.C signed a 6 MW turnkey job contract in September 2003 with KBR for
supply and operates diesel generators with its transformers and switchgear.
Location presidential place – Baghdad amount 3.600.000 USD
(H.O.C.) signed 9 MW turnkey job contract in October 2003 with KBR for
supply and operate diesel generators with its transformers and switchgear.
Location presidential place-Baghdad amount 5.430.000 USD.